Cottage Street Improvements
Project Name: | Cottage Street | |
Role: | Subcontractor | |
Location: | Town of Vienna, VA | |
Completion Date: | January 8, 2013 | |
Description: | Tyson's Construction Scope of Work includes but not limited to:Furnish and Install 5,575 Tons of Cement Stabilized Aggregate Base Material, Type I, No. 21-A. The scope of work is to be performed at 2 Lifts of CTA Base Material with each Lift it was Roll & Compacted with the 54" Smooth Drum Ride on Roller. VDOT CPE Interim reports are all 100% satisfied with our work & there were “NO” Work Zone Safety Issues / Violations. |
Project Name:
Project Name: Arlington Primaries and Interstate Sidewalk, Curb and Gutter Repairs
Project Number: VDOT Project No. D19C-000-750, N501
VDOT Order No. R-88
Role: Subcontractor
Location: Various Location, Arlington County
Estimated Completion Date: November, 2012
Description: Tyson's Construction Scope of Work Includes but not limited to: Outlet Pipe Replacement, Std. Curb CG-2, Curb 8", Std. Combination Curb & Gutter CG-6, CG-12 Detectable Warning Surface, Saw cut H.C.C. Items, Removal of Sidewalk and Entrance, Removal of Combination Curb & Gutter, Geotextile Drainage Fabric, Aggregate Material No. 25 or 26, Coarse Aggregate No. 8, Cement Concrete Sidewalk, 6" Pipe Underdrain, Group 2 Channelizing Devices, Class A3 Concrete, And Arrow Boards.